Sloop Concurrent

Olivierstraat 16

2021BL Haarlem

Any questions?

(06) 4012 5121

Send an email

info@sloop-concurrent.nl

Preparing a quotation

Which photographs help with a demolition quotation?

An overview of the work area, a close-up of the item to be removed and a view of the access route help with the initial assessment. Only take photographs from safely accessible positions, and do not damage materials to expose something.

Sloop Concurrent · Published on

Start with an overview

Make the first photograph an overview of the whole room or façade, showing the relevant element in context. A close-up of tiles says little about the bathroom's size or the distance to the door. Explain in the description what should be removed and what must remain.

Next, take a detail photograph if it adds useful information, such as the junction between a floor and wall or a visible part of the existing finish. Do not expose a pipe yourself or open up unidentified cladding. For a chimney, a photograph from a safe position is enough for the initial assessment; do not climb onto the roof to take it.

Three images, three different questions

ImageWhat should it make clear?Also mention
Work area overviewWhere will the work take place, and what is around it?Room, floor level and desired alteration.
Relevant detailWhich visible connection or finish needs to be considered?What is known and what remains unknown.
Access and routeHow will people, materials and waste reach the work area?Stairs, a lift, a narrow passage or parking restrictions.

Drawings provide additional information

State whether you have existing building drawings, structural calculations or a survey report. Include each document's date and the work it covers. A report for another part of the building does not automatically describe the current work area.

The quotation form accepts up to three photographs of no more than 2 MB each. If you have other documents, mention them in the description and then discuss how they can be supplied. Do not send identification documents or unnecessary personal information.

Complete your enquiry with a short description

State the town or postcode, the type of work, any approximate known dimensions and your preferred timeframe. Mention whether the property will remain occupied and whether other tradespeople are already scheduled. Make uncertainties explicit: “possibly load-bearing” is different from “assessed by a structural engineer”.

This information helps determine the next step. Sometimes a few additional questions are enough to prepare an initial proposal; structural work or unclear circumstances may still require a site visit or survey.

Frequently asked questions

Why is a site visit still requested after photographs have been provided?

A photograph shows only part of the situation. Hidden services, the structure and practical working space may require further investigation.

Should people or number plates appear in the photographs?

That is generally unnecessary for assessing demolition work. Where possible, choose images without unnecessary personal information.