Sloop Concurrent · Knowledge & preparation
Glossary of demolition and concrete work
32 commonly used terms explained in plain language. Use them to discuss your plans and better understand the description in a quotation.
A
- Asbestos survey
An investigation that records, within a defined scope, which asbestos-containing applications are present and what limitations the survey has. Have a specialist determine which survey suits your work.
More about asbestos surveys
B
- Broom-clean
A handover term whose precise meaning must be agreed. It does not automatically mean dust-free, level or ready for a new finish.
More about swept-clean handover- Internal demolition
Removing agreed components inside a building. The supporting structure or exterior is not automatically excluded in full: establish the boundaries of the work.
More about internal demolition- Building waste
A collective term for materials produced during building, renovation or demolition and disposed of as waste. Their composition determines the appropriate collection method.
More about building waste- Dust extraction at source
Extraction close to where dust is generated. The suitability of the system and any additional measures are tailored to the work.
More about extraction at source
C
- Strip-out to the building shell
Stripping back to an agreed shell. The finishes and services to be removed must be specified for each project.
More about strip-out demolition- Circular demolition
An approach in which preservation, dismantling and material reuse are organised in advance. A specific destination for the materials makes the claim verifiable.
More about circular demolition- Structural calculations
Calculations by a structural engineer substantiating the structural implications of a plan and the required solution. The scope determines what has been assessed.
More about structural calculations- Structural engineer
The specialist who assesses the structural behaviour and safety of a design or alteration and defines the necessary design assumptions.
More about structural engineers
D
- Dismantling
Taking components apart, for example to preserve particular elements. Reuse requires agreement on their condition, storage and destination.
More about dismantling- Diamond drilling
Drilling with tools that use industrial diamonds to cut the material. The application, diameter and method are matched to the material and surroundings.
More about diamond drilling- Support beam
A structural element that supports loads and transfers them to the supporting parts. The required section is specific to the project.
More about supporting beams- Load-bearing wall
A wall with a structural role in supporting or transferring loads. Its function cannot be reliably established by a tapping test alone.
More about load-bearing walls
M
- Additional work
Work outside the agreed assignment. Agree how its scope, price implications and prior approval will be recorded.
More about additional work
O
- Environmental permit
Authorisation for an activity that requires a permit. The procedure needed depends on the activity, location and rules.
More about environmental and planning permits- Bearing support
The structural contact point through which a beam or other load-bearing element transfers its load. Its construction is determined by the structural design.
More about structural bearing- Handover
The point at which the client and contractor review and record the agreed result and any outstanding items.
More about handover
P
- Rubble volume
The amount of space occupied by masonry material. Solid material volume differs from the volume of loose rubble.
More about rubble volume
R
- Renovation strip-outs
Demolition in preparation for renovating an existing building. Components to be retained and the connection to the renovation work are determined in advance.
More about renovation demolition
S
- Chimney breast
The visible structure surrounding a fireplace or hearth. Its connection with the flue and structural elements above must be investigated before removal.
More about chimney breasts- Scope
The scope of the job: what will be carried out, what will remain and what falls outside the price or responsibility.
More about the scope- Chase cutting
Cutting a groove in a suitable surface, for example for services. Its depth and position are determined in relation to existing pipes and cables and structural limits.
More about channel cutting- Demolition notification
Notification of a demolition activity where required by the applicable rules. This is separate from any permit application.
More about demolition notifications- Opening
An opening in a wall, floor or other part of a building, for example for a pipe or a passage. The structural implications are assessed beforehand.
More about openings- Steel structure
An assembly of steel load-bearing components and connections. Materials, dimensions and connections are determined by the design.
More about steel structures- Provisional sum
A provisional amount for an element that is not yet fully defined. Record the assumption and how the final amount will be calculated.
More about provisional sums- Temporary propping plan
A plan for temporary support during an alteration. The necessary detail and checks depend on the structure and sequence of work.
More about temporary support plans
T
- Complete demolition
Removing a structure within the agreed scope. Foundations, groundworks and handing over a build-ready site must be explicitly specified.
More about complete demolition- Stairwell opening
An opening in a floor for a staircase. The design must suit the structure, the staircase and its safe use.
More about stairwell openings
V
- Pre-work survey
Recording the relevant existing condition before work begins, for example with photographs and descriptions. This does not replace a structural assessment.
More about pre-work surveys
W
- Wall sawing
Professional wall cutting, for example to create an opening. The method and handling of released sections are tailored to the project.
More about wall sawing
Z
- Cutting slurry
The mixture of fine material particles and water that may form during wet cutting. Collection and disposal are part of the work agreements.
More about cutting slurry

